施组设计下载简介:
内容预览随机截取了部分,仅供参考,下载文档齐全完整
深圳西部通道填海及地基处理工程施工方案深圳西部通道填海及地基处理工程
一、施工组织设计··················································1
1编制依据······················································1
2工程概况······················································2
现浇钢筋混凝土梁施工工艺施工框图3施工部署······················································5
4本工程的关键工序及采取的相应技术措施··························7
5主要工程项目的施工方案、施工方法······························8
5.1场地平整、清理············································8
5.2隔堤强夯挤淤··············································8
5.3伏堤振冲碎石桩施工········································9
5.4土工布铺设···············································10
5.5砂垫层施工··············································10
5.6盲沟、集水井施工········································10
5.7塑料插板施工············································11
5.8底基层填筑··············································12
5.9堆载施工················································13
5.10施工质量监测···········································13
6拟投入的主要施工机械设备、劳动力进场计划·····················14
7施工进度计划·················································15
8施工总平面规划···············································16
9确保工程质量的技术组织措施···································17
附图表一:质量检查组织机构图·································22
附图表二:用于质检的仪器、设备表·····························23
附图表三:质量保证体系框图···································24
10确保安全生产的技术组织措施··································25
11确保文明施工的技术组织措施··································27
12确保工期的技术组织措施······································28
13雨季施工技术措施············································29
14环境保护技术组织措施········································30
15地上地下设施的保护加固措施··································30
16服从业主、监理工程师全过程管理保证措施······················31
表8.1拟投入的主要施工机械设备表······························32
表8.2劳动力计划表············································33
表8.3计划开、竣工日期和施工进度网络图························34
表8.4施工总平面布置图及临时用地表····························36
二、项目管理班子配备情况·······································37
表8.5项目管理班子配备情况表··································37
表8.6项目经理简历表··········································38
表8.7项目技术负责人简历表····································40
表8.8项目管理班子配备情况辅助说明资料························41
QTZ63塔吊,QTZ63塔吊施工方案三、项目拟分包情况··············································67
表8.9项目拟分包情况表········································67
工程名称:西部通道填海及地基处理工程(第5合同段)
投标文件内容:技术标投标文件
投标人:xx公司深圳分公司
DB11/T 1671-2019标准下载一、施工组织设计或施工方案
二、项目管理班子配备情况