标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
BS EN 489-2009 区域供暖管道.直埋式热水管网用预先绝热有包覆管层的管道系统.聚氨基甲酸乙酯热绝缘和聚乙烯外覆层的钢管用.pdfThejointcasingshallbetightagainstexternalwa
BSEN489:2009 EN489:2009(E)
4.2.1Water tightness
投标用--生活污水收集管道完善工程一常福街道东山路、深圳路污水主管网工程施工组织设计.docx4.2.2Soil stress test
4.2.3.2Cell structure
Theaveragesizeof thecellsinaradialdirectionshallbeless than0,5mm,determinedinaccordancewith5.4.5.1. The closed cell content determined in accordance with 5.4.5.2 shall be not less than 88 %.
Theaveragesizeof thecellsinaradialdirectionshallbelessthan0,5mm,determined inaccordancewith5.4.5.1. Theclo sedcellcontehtdetermllhedinac
4.2.3.3Foamdensity
e densityof thefoamat anypositionshallbenot less than 60kg/mwhenmeasured in accordance specimenmayhaveadensitybelow60kg/m?
Whentestedinaccordancewith5.4.7,thewaterabsorptionafter90minof immersioninb exceed10%oftheoriginalvolume.
4.2.4Weldjointstresscrackresistance
3)Ernst Kaufmann.050715
4.3Installationinstructions
4.3.1Genera
BSEN489:2009 EN489:2009(E)
4.3.2Work environm
edurestoobtainoptimumworkconditionsonsite
4.3.3 Cleaning
erproceduresforthecleaninganddryingshallbe
steelpipesurfaces; insulationsurfaces; jointcasingsurfaces; casingsurfaces Thesentence"Anywetfoamshallberemovedfrom thepipeends"shallbeincludedin theinstructions.
steelpipesurfaces; insulation surfaces; joint casing surfaces; casing surfaces. Thesentence"Anywetfoa
4.3.4Surveillancesystem
Whenmeasuringelementsforasurveillancesystemisinstalledinthejoint,properproceduresfd surveillance system shallbe specifiedbefore the assembly takes place.This specification shall 14419andincludeproceduresfor:
assemblywork injoints toensurethefunctionof thesystem; assemblycheckof the surveillance system duringconstruction; testafterfinishingameasuringsection.
4.3.5Steelsiteweld
Properproceduresfor thesteelweldshallbedescribed.This descriptionshall,asaminimum, "Weldingprocess"and"Preparationforweldingandliningup"inaccordancewithAnnexA.
4.3.6Joint casing
4.3.7Joint insulation
Properproceduresforonsitefoamingofjointsorinstallationofprefabricatedjointinsulationshallbedescribed Thefollowingproceduresfor onsitefoaming ofjointsshall,asaminimum,bedescribed:
BSEN489:2009 EN489:2009(E)
5.1Soilstresstest
The soil stress test shall be carried out as follows
BSEN489:2009 EN489:2009(E)
Dimensions in millimetres
Figure1—Minimumdimensionsofsandbox
BSEN489:2009 EN489:2009(E)
Figure2—Standardsandquality
Threetestspecimensofminimumlength2,5mwithajointcasinginthemiddleshallbeused.
5.1.4Sandbox test
Thefollowingtestparametersshallbeused: servicepipe temperature of(120± 2)°Cmaintained for 24 hbefore the testing; simulated sand overfill of 1 m (18 kN/m² effective vertical soils stress); displacementof75mm; forwardspeedof10mm/min; backwardspeedof50mm/min; 100cycles,whereacycleisdefinedasoneforwardandonebackwardmovem
5.2Waterimpermeabilitytest
BSEN489:2009 EN489:2009(E)
SamplesshallbetestedaccordingtoClause5.2.4inEN253:2009 Thetestsamplesshallbecutperpendiculartotheweldseam Thesampleshallcoverthewholelengthofweldseamplusatleast20mmparallellengthbetweenthedumbbel shouldersandtheoutsideoftheweldedareainbothends Asa deviation to thetestmethod in5.2.4of EN 253:2009,nonotchshallbecut in thesample. NoTETheweldseamisconsideredtobethenotch Samplesofoverlapweldsshallbeprotectedfromexcessivebendingforces.Measuresshallbetakeninthedesign oftheclampingdevicetopreventthis. Incasethematerialthicknessofcasingandjointcasingdiffer,thetensilestressshallbecalculatedbaseduponthe Smallerthickness.
5.4.1 General
Thetypetestsforpolyurethanerigidfoaminsulation(PUR)forjointsshallbecarriedoutinaccorc EN253:2009,withtheadditionsgivenin5.4.2to5.4.7
)Ernst Kaufmann. 050715
BSEN489:2009 EN489:2009(E)
Dimensions in millimetres
Dimensionsinmillimetres
Figure3 Specimensfortestingageingresistanceofjointfoam
5.4.3Sampling
5.4.4Ageingresistance
TwojointsshallbepositionedinaccordancewithFigure3
Thepipeandjointspecimenshallbeagedbymaintainingtheservicepipeatatemperature hours,or alternatively at atemperatureof 170°℃ for 1450hours,while the casingpipe temperature.
temperature shallbe recorded continuously during the aging period and shall not deviate more than O,5 °C from the requiredtemperature. Aftercoolingtoroomtemperature,thejointsshallbeopenedforinspection
After cooling toroomtemperaturethejointsshallbeopenedforinspection
5.4.5 Cell structure
5.4.5.1 Cell size
富县城市生活污水处理工程施工组织设计of thecells shallbedeterminedoveralengthof10mmmeasured inaradial directionwiththe ce nmeasurementcoincidingwiththecentrepointoftheappliedinsulation. of thecellsshallbethequotientofthetestlengthand thenumberofcellscountedalong theradia 1selected andshallbedetermined as an averagevalueof measurementson3specimens.
5.4.5.2Closed cellconten
Theratioof open toclosed cells shallbe determined in accordancewith EN ISO4590:2003(method 1). Deviatingfrom theproceduredescribed in EN ISO4590 the test specimen shall be a cube with an edge of 25 mm. If this size of cube cannot be cut from the insulation in accordancewith5.4.5.1,the dimensions shall be 25 mmx 25mmxt,wheretisthemaximumradialthickness.
5.4.6Foamdensity
ThedensityshallbemeasuredinaccordancewithENISO845
ThedensityshallbemeasuredinaccordancewithENISO845.
SJ/T 1542-2020 电真空器件用镍及镍合金化学分析方法.pdfBSEN489:2009 EN489:2009(E)
Test specimens shall be takenfrom the centre of the foam in sets of three in accordance with Clause 5.1.2.5.of EN 253:2009.Each testspecimen shallbe30 mmx30 mmxtwheretis the maximum obtainable thicknessbut not exceeding 30mm.Alternatively,test specimens shall be cylindrical,30mm long in the axial direction of thepipe andofdiameterdwheredisthemaximumobtainablediameterbutnotexceeding30mm.