标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
GB/T 51152-2015 波分复用(WDM)光纤传输系统工程设计规范(英文版).pdf3.3.5The application code of wDM system shallbe determined according to such factors as station configuration,fiberparameters,systemcapacity,etc.
3.4CentralWavelengthAllocation
Thenominal central wavelengths of thechannelsof CWDM systems shall be in accordancev se specified in Table 3.4.2.
0.4.2 those specified in Table 3.4.2
JR/T 0222-2021 金融信息系统加密服务的技术能力评价模型Table3.4.2CWDM svstem channel wavelengthallocationplar
3.5MainPathInterface
3.6 OTU Interface
(WDM)Systems. 3.6.4The CWDM systemschannel signal interfaceparameters at the S/Rreference point shall meet the requirementsof the currentprofessional standardYD/T1326TechnicalRequirements of Coarse WavelengthDivisionMultiplering(CWDM)
ptical SupervisoryCha
4TransmissionSystemDesign
5 AuxiliarySystems
5.1NetworkManagementSystem
O NetworkProtection
6.1Network Topology
TransmissionSystemPerformance
Transmission SystemPerformance
7.2BitErrol
7.3.2The requirement of WDM systemsinput jitter tolerance shall be the same as that of theOTU interface's inputjittertolerance
7.3.2The requirement of WDM systemsinput jitter tolerance shall be the same as that of theOTU interface's inputjittertolerance,
8SelectionandConfigurationofEquipment
8.1Selectionof Equipment
8.2Configuration of Equipment
CY/T 184-2019 CNONIX图书产品信息采集规范9 EquipmentInstallation
9.2StationLayoutandEquipmentArrangement
9.4 Cable and Wiring
Explanationof Wording inThis Code
ListofQuotedStandards
FZ/T 12025-2011 毛经用低捻棉本色纱of Quoted Standa