标准规范下载简介和部分内容预览:
GB_T51296-2018 石油化工工程数字化交付标准-英文版.pdf4.4Plantobject numbering specificati
.1The rules on plant object tag shall be specified in the plant object tag specification to meet uirements ofrapidretrieval andlocation 2The plant objecttag shallbe unique and meet therequirements of rapid retrieval and location
QHCCC 0012S-2015 珲春长城菌业科技开发有限公司 食用菌配制酱Documentnamingandnumberingspecificatio
5Deliverycontentandform
General requirement
5.2.1The delivered data should include information such as values and UoM of plant object attributes. 5.2.2Thedelivered data shallbe organized according to the requirements of the class library 5.2.3Thedata contents ofplantobjectshould includethebasic information ofengineering,procurement, constructionandotherstages.
53Document
The electronic files shallnotcontain anylinks to otherdocuments
5.4.1The3D model tobe delivered shall meet the requirements of delivery scope,content and level of 5.4.2The 3D model information to be delivered shall beconsistentwith the information in other delivereddataanddocuments.) 5.4.3The 3D model to be delivered shall be retrieved and displayed correctly in the delivery platform. 5.4.4 The 3D model to be delivered shall be based on aunified coordinate system and coordinate origin. 5.4.5The 3D model to be delivered should includea visual volume of interference checking. 5.4.6 The3D model to be delivered shall not contain information irrelevant to delivery, such as temporaryinformationandtestinformation.
5.5Deliveryform
5.5.1Digital delivery should be handed over in thepattern of delivery platform or information model. 5.5.2Thehandoverpattern of deliveryplatform shallmeettherequirements ofplatforminformation organization. 5.5.3The handover pattern of informationmodel shall conform to the organization rules of information model agreed in theinformationdelivery scheme
6 Deliveryprocess
6.1.1The information delivery strategy shall specify the objectives of information delivery and the organizations,workscopeandresponsibilities oftheparticipants. 6.1.2The information delivery strategy shall specify the laws, regulations and standards to be followed. 6.1.3Theinformation delivery strategy shall specifytheorgamizatione orageanddeliverypatterns. 6.1.4The information delivery strategy shall specify theaeceptance criteria. 6.1.5The information delivery strategy shall include the workflow of information delivery, which shouldbecarriedoutaccordingtoFigure6.1.5.Y
Figure 6.1.5 Workflow of information delivery Task JContent/result > Condition
6.1.6The information delivery strategy shall include the quality management scheme
6.2Informationdeliverybasis
6.5Information hand
6.5Informationhandover
6.5.1Theinformationhandovershallbecarriedoutinaccordancewiththedeliverypatternan schedule agreed in the information delivery scheme. 6.5.2The electronic file list of delivery information shallbeprovidedduring the informationhandover and the list shallincludefilename,format,description.issue date,version,etc
6.6Informationacceptance
documentsand3Dmodels 6.6.2The delivery information acceptance shall verify the integrity,accuracy and consistencebased or the information deliverybasis. 6.6.3The delivery information acceptance shall include the following items:
cumentsand3Dmodels. .2The delivery information acceptance shall verify the integrity,accuracy and consistencebased information deliverybasis. .3Thedelivery informationacceptance shall includethefollowing items:
/ Deliveryplatform
7.1 Function requirements
AppendixA Plantbreakdownstructureanditsdatastructure associatedwithplantobjectsanddocuments
A.0.1The data elements describing the plant shall meet the requirements of Table A.Q.1. Table A.0.1Data elements of the plant
.5The dataelements describingtheplant objects shallmeet the requirements of TableA.O.5. TableA.0.5Dataelements ofplantobiects
A.0.6 The data elements describing the document shall meet the requirements of Table A.O. TableA.0.6Data elements ofdocuments
AppendixBData structureofclasslibrary
B.0.1The data elements describing the plant object class shall meet the requirements of Table B.0.1. Table B.0.1Data elements of plant object class
Table B.0.5Data elements of UoM
B.0.6The data elements describing the correlation between measurement classes and units oj ment shallmeet the requirements of Table B.0.6. Table B.0.6Data elements of correlation between UoM classes and UoM
B.0.7The data elements describing discpline shall meet the requirements of Table B.0.7 Table B.0.7Data elements of discpline
AppendixCClassificationandpropertyoftypicalplantobject
C.0.1The classification of typical plant object class should meet the requirements ofTable C.0.1. Table C.0.1Classification of typical plant object class
Table C.0.1(continued)
Table C.0.1(continued)
Table C.0.1(continued)
Table C.0.1(continued)
Table C.0.1(continued)
able C.0.2General attributes of the plant object class
C.0.3The attributes describing the vessel should meet the requirements of Table C.0.3 Table C.0.3Attributes of vessel
C.0.4The attributes describing the tray column should meet the requirements of Table C.0.4 Table C.0.4Attributes of travcolumn
Table C.0.4(continued)
Table C.0.5Attributes of shell and tube heat exchang
Table C.0.5(continued)
Table C.0.6(continued)
C.0.7The attributes describing power pumps should meet the requirements of Table C.0.7. Table C.0.7Attributes ofpowerpumps(centrifugal pumps)
Table C.0.7(continued
C.0.10The attributes describing the facilities of fire water system should meet the requirements
e C.0.10Attributes of the facilities forfirewater svstem
Table C.0.10(continued
C.0.11Theattributes describing thepiping shouldmeet therequirements of Table C.0.11
Table C.0.11 Aftributes of piping
C.0.12The attributes describing the safety relieving elements should meet the requirements of TableC.0.12
0.12The attributes describing the safety relieving elements should meet the requirements bleC.0.12
Table C.0.12Attributes of safety relieving elements
Table C.0.13(continued
Table C.0.14(continued
C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15
C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15
.15 The attributes describing the power transformer should meet the requirements of Ta .15
Table C.0.15Attributes of power transformer
C.0.16The attributes describing the frame should meet the requirements of Table C.0.16.
C.0.16The attributes describing the frame should meet the requirements of Table C.0.16 TableC.0.16Attributes offrame
C.0.17 The attributes describing buildings should meet the requirements of Table C.0.17. TableC.0.17Attributes ofbuildings
AppendixDTypicaldeliverycontents of documents
D.0.2The delivery list ofprocess design (AB)documents shouldmeetthe requirements ofTa Table D.0.2The delivery list requirements of process design (AB) documents
ne delivery list of process design (AB) documents should meet the requirements of Table D.0.2 Table D.0.2The delivery list requirements of process design (AB) documents
D.0.3The delivery list of static equipment design(AC)documents should meet the requirements of TableD.0.3
0.3The delivery list of static equipment design(AC)documents should meet the requirements bleD.0.3
Table D.0.3The deliverv list of static equipment design(AC)documents
D.0.5The delivery list of industrial furnace design(AE)documents should meet the requirements of TableD.0.5
GB/T 50417-2017 煤矿井下供配电设计规范.0.5The delivery list of industrial furnace design(AE)documents should meet the requir TahleD05
very list of industrial furnace design(AE)documents should meet the requirements of
Table D.0.5The delivery list of industrial furnace design(AE)documents
Table D.0.5(continued)
D.0.7The delivery list of piping design(AG)documents should meet the requirements of Tal Table D.0.7The delivery list of piping design(AG)documents
Table D.0.8(continued)
Table D.0.9(continued)
Table D.0.9(continued)
SN/T 4624.20-2021 入境环保用微生物菌剂检测方法 第20部分:泛养副球菌able D.0.11 The delivery list of architectural design(AL)document