(ABB技术应用白皮书5)Circuit-breakers-for-direct-current-applications 2011【经典】.pdf

4.1 Storage batteries

Structureofastoragebattery

LY/T 2400-2014 浅色松香类产品铂钴比标准试验方法4Generation

TechnicalApplication Papers

4.2 Static conversion

4.2 Static conversion

4.3 Dynamo

The following figure shows the structure of a dynamo

5 Remarks on the interruption of direct curre

Jirectcurrentpresentsdifferentpr nalternat ing current with aregard to the phenomena associated to the interruption of high value currents since the arc extinction results to be particularly difficult.

To understand the above, reference to the circuit shown in the figure shall be made:

The current keeps on rising for a short instant also after the beginning of contact opening, and then decreases depending on the value higher and higher of the arc

nofdirectcurrent

Commonsolution Figure 9 Network insulated from earth

6.1Network insulated from earth

also thisfault (as faultB)between a polarity and earth has no consequences fromthe point of view of theplant operation

Doublefault(faultB+faultC)

Technical Application Papers

6.2 Network with one polarity earthed

electricity to be discharged to earth.

electricity to be discharged to earth

upply source

Conclusions

Technical Application Papers

6.3Network with the middlepoint of the

6.3Networkwiththemiddlepointof the supplysourceconnectedtoearth

Common solutior

FaultB: the fault between the polarity and earth sets up a short circuit current lower than that relevant to the fault be tween the two polarities, since it is supplied by a voltage equalto depending on the soil resistance.

Fault C: in this case, the fault is analogous to the previous case, but it concerns the negative polarity.

Conclusions

Technical Application Papers

7 Choice of the protective device

RatedoperationalvoltageUe It represents the value of voltage which determines the application of the equipment and to which all the other oarameterstypicaloftheeguipmentarereferred

Technical Application Papers

protectivedevice

Technical Application Papers

modality of poles (for MCCBs type SACE Tmax X7) in an insulated ne

protectivedevice

Technical Application Papers

or higher voltagas, ask ABE

Technical Application Papers

for higher voltage ask ABE

TechnicalApplication Papers

8 Use of alternating current equipment in

NB/T 34063-2018 生物质锅炉供热成型燃料术语ipmentindirectcurren

Technical Application Papers

Table 19 Coefficient km accordling to the connection modality of the CB poles

I3= 10 xIln x km = 10 x 160 x 1.3= 2080 A (±20% tolerance)

8.2ConnectionoftheCBpoles inparallel

GB 4009-89 硅铬合金ent in direct curreni