(ABB技术应用白皮书4) circuit-breakers inside LV switchboards 2008.pdf

(ABB技术应用白皮书4) circuit-breakers inside LV switchboards 2008.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:1.2 M
标准类别:建筑工业标准
资源ID:261023
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

(ABB技术应用白皮书4) circuit-breakers inside LV switchboards 2008.pdf

OTCinterface

2 Advices to improve the current carrying capacity

Advicestoimprovethec

DB11T 1826-2021 森林消防综合应急救援队伍训练规范sideswitchboards

n its turn,the enclosure exchanges heat towards the external environment. Also this heat exchange occurs by conduction (through the cables connected to the

assembly),convection andradiation,asshownin Figure 7. In enclosures with a degree of protection not very high or with ventilation openings, part of the heat s exchanged througha realaircirculationbetweenthe assemblyandtheexternalenvironment. Fiaure7

2.1 Power loss inside switchboards

2.1.1 Internal structure

As an example to illustratethe influence of this pheno menon, Table 4 shows thepercentage value representing the part of losses developing inside the enclosure related to the power loss inside the conductor bars.

romthesedata.itresultsthattheincreaseoftherated currentand consequentlythenumberofbusbarsin Darallelperphaseandthematerialusedfortheseparation of the conductorbars may considerably affect heating.

Advicestoimprovethe

currents shall result into nullinduction; on the contrary. if each conductor is enclosed by a single ring (Figure 8a), the total induction is not null, with the consequent circulation of induced current,powerloss andtherefore heatgeneration

sideswitchboards

Technical Application Papers

ying capacity of the circuit

sideswitchboards

side switchboards

eakersinsideswitchboards

Pc = Pnc × (Ib / Incr)2

Pse = Pnse (Ib/lnsB)2 × 3 × LsB

efore, with reference to the typology, the length "L" and the load current of the busbars installed inside nboard, the contribution in terms of power loss of the single length and the total power loss are reporte 11below:

Cables As regards cables, taking reference to Table 8 above, the same method used for the busbars can be applied and therelevantresultsarereported inTable12

side switchboards

Then, the total power dissipated inside the switchboard is given by the sum of the three conti termined above, therefore:

2.1.4 Paths of the current

side switchboards

Technical Application Papers

2.2Dissipationof the heat generated

2.2.1 Switchboard ventilation

Kersinsideswitchboards

2.2.2 Side surfaces and positioning 0

switchboards

covered. The values of the parameter "b" related to the different surface tvpes are shown in Table 13.

2.2.3 Forms of internal separation of

switchboards

Table 14: For enclosures without ventilation openings and effecti oolingsurface>1.25m

r enclosures without ventilation openings and effective ooling surface>1.25m

15: For enclosures with ventilation openings and effective

Fromthetablesabove,itresultshowhorizontalpartitions can cause air temperature rises up to30% (3partitions without ventilation openings),

2.2.4 Switchboardprotection degree

2.3 Dissipation of the heat generated in the

sideswitchboards

blems linked to conved

breakersinsideLVswitd

Technical Application Papers

side switchboards

tofacilitatetheconnectionbetweentheverticalterminals andtheverticalconnectionbusbars,itispossibletouse bars suitablybent as shown inFigure 16.

too much the air flow and prevent it from reaching the upper terminals causing the loss of the benefits of cooling oyconvection

side switchboards

Technical Application Papers

side switchboards

2.3.2 Problems linked to conduction

side switchboards

insideswitchboards

FcErotflateteminals for

T4250 Fixed

insideswitchboards

T5400 Fixed

insideswitchboards

T6630 Fixed

T6630 Withdrawable

sideswitchboards

T6800 Withdrawable

nsideswitchboards

nsideswitchboards

NB/T 10393-2020 海上风电场工程施工安全技术规范7V1000 Withdrawable

nsideswitchboards

sideswitchboards

T7V1250 Withdrawable

nsideswitchboards

FZ/T 51008-2014 再生聚酯(PET)瓶片T7 S.H.L. 1600

sideswitchboards

10°℃ 20°℃ 30°℃ 40°℃ 50°℃ 60°℃C 70°C In [A] MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX 20 19 27 18 24 16 23 14 20 12 17 10 15 8 13 32 26 43 24 39 22 36 19 32 16 27 14 24 11 21 50 37 62 35 58 33 54 30 50 27 46 25 42 22 39 80 59 98 55 92 52 86 48 80 44 74 40 66 32 58 100 83 118 80 113 74 106 70 100 66 95 59 85 49 75 125 103 145 100 140 94 134 88 125 80 115 73 105 63 95 160 130 185 124 176 118 168 112 160 106 150 100 104 90 130 200 162 230 155 220 147 210 140 200 133 190 122 175 107 160 250 200 285 193 275 183 262 175 250 168 240 160 230 150 220

©版权声明
相关文章