标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdfExample:48mSuitePlan
1.Bathroom Fixtures<15B>
2.Bathroom:
June2007 7A
DL/T 707-2014 HS系列环锤式破碎机GuestroomCorridors&SupportSpaces
GuestroomCorridors&SupportSpaces
Table of Contents
Marriott Confidentialand Proprietary Information
The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott. Copyright, Marriott International, Inc., unpublished material. All rights Reserved
GuestroomCorridorsandSupportSpaces
GuestroomCorridorsandSupportSpac
B.GuestroomCorridors
D.Ice Service
1. Program: Locate ice service convenient to guests in a central location, such as the retail store.Sensitively plan and locate to minimize exposure(noise and views)from guestroom corridor or public area.As an alternate,ice may be provided by RoomService,depending on the local marketand custom. 2. Ice Dispenser: Provide ice dispensing unit (not bin type) to ensure the sanitation of the ice. 3. Size / Area: . Entry: Minimum 0.9 m (3 ft.) wide . Ice Machine Area: Minimum 2 m² (20 sq. ft) for ice machine/dispenserwhenrequired
G.Exit Stairs
QYXMG 0001S-2015 沂水县小马哥食品有限公司 菇肉酱ExecutiveGuestLounge(EGL)
Table of Contents
The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott.
Copyright, Marriott International, Inc., unpublished material. All rights Reserved
riott Confidentialand ProprietaryInformati
GA/T 774-2019 指掌纹特征规范ExecutiveGuestLounge
B.Entrance/ Fover