20kV及以下配电网工程设备材料价格信息(2020年上半年)(定额[2020]37号 电力工程造价与定额管理总站2020年9月25日).pdf座雷器第章设备名称型号规格计量单位价格(元)交流避雷器AC20kV,34kV,95kV台217交流避雷器AC20kV,26kV,72kv台189交流避雷器AC10kV,17kV,50kv台123AC10kV,17kV,45kv台97交流避雷器AC10kV,13kV,40kv台80交流避雷器1515
章配电屏柜设备名称型号规格计量单位价格(元)5.1一二次融合成套环网箱一二次融合成套环网箱AC10kV, 630A, SF6套206500一二次融合成套环网箱AC10kV,630A,固体套231800一二次融合成套环网箱AC10kV,630A,环保气体套2460005.2高压开关柜高压开关柜AC20kV,站用变开关柜,1250A,25kA台119100高压开关柜AC20kV,站用变开关柜,630A,25kA台76200高压开关柜AC20kV,馈线开关柜,1250A,25kA台102500高压开关柜AC20kV,馈线开关柜,630A,25kA台47500高压开关柜AC20kV,进线开关柜,1250A,25kA台113900高压开关柜AC20kV,进线开关柜,630A,25kA台54300AC20kV,母线设备柜,1250A,无开关台106100高压开关柜AC20kV,母线设备柜,630A,无开关台47100高压开关柜AC20kV,分段断路器柜,1250A,25kA台107100高压开关柜AC20kV,分段断路器柜,630A,25kA台48500高压开关柜高压开关柜AC20kV,分段隔离柜,1250A,25kA台63500AC20kV,分段隔离柜,630A,25kA台34900高压开关柜1716
第6章控制保护装置设备名称型号规格计量单位价格(元)6.1低压电容器柜低压电容器柜AC380V,固定式,360kvar台26500低压电容器柜AC380V,固定式,300kvar台21000低压电容器柜AC380V,固定式,240kvar台19100低压电容器柜AC380V,固定式,160kvar台16100低压电容器柜AC380V,固定式,130kvar台12700低压电容器柜AC380V,固定式,100kvar台12100低压电容器柜AC380V,固定式,60kvar台10100低压电容器柜AC380V,常规+SVC,360kvar台48300低压电容器柜AC380V,常规+SVC,300kvar台45500低压电容器柜AC380V,常规+SVC,240kvar台43000低压电容器柜AC380V,抽屉式,300kvar台13900低压电容器柜AC380V,抽屉式,240kvar台12800低压电容器柜AC380V,抽屉式,150kvar台124006.2电流互感器电流互感器AC10kV,1500/5台1440电流互感器AC10kV,1000/5台14302922
续表设备名称型号规格计量单位价格(元)电流互感器AC10kV,800/5台1260电流互感器AC10kV, 600/5台1060电流互感器AC10kV, 500/5台630电流互感器AC10kV,400/5及以下台560电流互感器AC500V, 1500/5台105电流互感器AC500V, 1000/5台99电流互感器AC500V, 800/5台94电流互感器AC500V, 600/5台93电流互感器AC500V,400/5及以下台906. 3电压互感器电压互感器AC10kV,干式,三相,0.5台3690电压互感器AC10kV,千式,三相,0.2台2350电压互感器AC10kV,干式,单相,0.5台1320电压互感器AC10kV,干式,单相,0.2台8506.4柱上无功补偿成套装置柱上无功补偿成套装置AC10kV, 450kvar套2334030续表设备名称型号规格计量单位价格(元)柱上无功补偿成套装置AC10kV,300kvar套21700柱上无功补偿成套装置AC10kV, 150kvar套18730柱上无功补偿成套装置AC380V, 60kvar套10630柱上无功补偿成套装置AC380V,30kvar套89406.5组合互感器组合互感器AC10kV,千式台38806.6变电站监控系统变电站监控系统AC10kV套1902006.7测量控制装置测量控制装置AC10kV套373006.8智能巡检控制系统智能巡检控制系统AC10kV套1433006.9配电终端配电终端站所终端(DTU)套16350配电终端馈线终端(FTU)套6390配电终端配变终端(TTU)套28203123
续表设备名称型号规格计量单位价格(元)6.10备用设备及备用电源自动投入备用设备及备用电源自动投人AC10kV套11220备用设备及备用电源自动投人AC400V套80006.11母联(分段)保护母联(分段)保护AC10kV套75006. 12电容器保护电容器保护AC10kV套82006. 13线路保护线路保护AC10kV套85006. 14蓄电池组蓄电池组DC12V,200Ah套34900蓄电池组DC12V,150Ah套30900蓄电池组DC12V,100Ah套15500蓄电池组DC2V,1200Ah套43600蓄电池组DC2V,1000Ah套37700蓄电池组DC2V,800Ah套3670032续表设备名称型号规格计量单位价格(元)蓄电池组DC2V, 500Ah套33400蓄电池组DC2V, 400Ah套30600蓄电池组DC2V, 300Ah套27900蓄电池组DC2V, 200Ah套20600蓄电池组DC2V, 100Ah套140006.15UPS电源(不间断电源)UPS电源(不间断电源)100kVA套131200UPS电源(不间断电源)80kVA套127500UPS电源(不间断电源)40kVA套113300UPS电源(不间断电源)30kVA套67100UPS电源(不间断电源)25kVA套58700UPS电源(不间断电源)20kVA套41400UPS电源(不间断电源)15kVA套38000UPS电源(不间断电源)10kVA套248007.5kVA套UPS电源(不间断电源)16800UPS电源(不间断电源)5kVA套160003324
续表设备名称型号规格计量单位价格(元)6. 20变电在线监测装置变电在线监测装置变电设备在线监测主站套93900变电在线监测装置SF。监测系统套164006.21线路在线监测装置线路在线监测装置综合在线监测装置套1321006. 22解列装置解列装置AC10kV套213006. 23减载装置减载装置AC10kV套49506. 24消谐装置消谐装置AC10kV套56506. 25合并单元合并单元常规互感器,常规互感器套250006. 26智能一体化电源系统智能一体化电源系统DC220V,500A套1136300智能一体化电源系统DC220V400A套62960036续表设备名称型号规格计量单位价格(元)智能一体化电源系统DC220V,300A套578200智能一体化电源系统DC220V,100A套188200智能一体化电源系统DC220V,80A套151200智能一体化电源系统DC220V,70A套141200智能一体化电源系统DC220V, 50A套130500智能一体化电源系统DC220V,40A套75100智能一体化电源系统DC110V,900A套13947006.27防雷设备防雷设备浪涌保护台472防雷设备线路过电压保护器台82防雷设备绝缘子式限压器台283防雷设备绝缘线路防雷装置台64防雷设备避雷针台73943726
续表设备材料名称型号规格计量单位价格(元)普通光缆12芯,G.651,非金属阻燃光缆km4420普通光缆6芯CB/T 4157-2011 船用液压控制截止阀,G.651,非金属阻燃光缆km3200普通光缆4芯,G.651,非金属阻燃光缆km31707.17全介质自承式光缆(ADSS)全介质自承式光缆(ADSS)96 芯, G. 652, ≥25. 2kNkm17580全介质自承式光缆(ADSS)96芯, C.652,≥36. 8kNkm21700全介质自承式光缆(ADSS)96芯, C. 652, ≥42. 6kNkm22460全介质自承式光缆(ADSS)72 芯, G. 652, ≥12. 4kNkm11940全介质自承式光缆(ADSS)72 芯,G. 652,≥18. 2kNkm13770全介质自承式光缆(ADSS)72芯, G.652,≥31.0kNkm18450全介质自承式光缆(ADSS)72 芯, G. 652, ≥40. 3kNkm18660全介质自承式光缆(ADSS)48芯, G. 655, ≥12. 4kNkm20180全介质自承式光缆(ADSS)48 芯, G. 652, ≥11. 0kNkm11610全介质自承式光缆(ADSS)48 芯, G. 652, ≥12. 4kNkm11750全介质自承式光缆(ADSS)48 芯, G. 652,≥18. 2kNkm12270全介质自承式光缆(ADS5)48芯,G.652,≥31.0kNkm1497044续表设备材料名称型号规格计量单位价格(元)全介质自承式光缆(ADSS)48芯, G.652,≥34.5kNkm15740全介质自承式光缆(ADSS)48 芯, G.652, ≥40.3kNkm17370全介质自承式光缆(ADSS)48 芯, G. 652, ≥49. 6kNkm17800全介质自承式光缆(ADSS)48 芯, C.652, ≥57.8kNkm23650全介质自承式光缆(ADSS)48 芯, G.652, ≥64. 7kNkm25070全介质自承式光缆(ADSS)36 艺, G. 652, ≥11.0kNkm9470全介质自承式光缆(ADSS)36 芯, G. 652, ≥16. 0kNkm12280全介质自承式光缆(ADSS)36 芯, G. 652, ≥24. 0kNkm13240全介质自承式光缆(ADSS)36 芯, G. 652, ≥39. 0kNkm14860全介质自承式光缆(ADSS)36 芯, G. 652, ≥30. 6kNkm13770全介质自承式光缆(ADSS)36芯,G.652,≥48. 0kNkm18770全介质自承式光缆(ADSS)36 芯, G. 652, ≥55. 0kNkm20070全介质自承式光缆(ADSS)24芯,G.655,≥11.0kNkm8810全介质自承式光缆(ADSS)24 芯, G. 655, >55. 0kNkm26250全介质自承式光缆(ADSS)24 芯,G.652, ≥11.0kNkm9270全介质自承式光缆(ADSS)24 芯, G.652, ≥16. 0Nkm99504530
续表设备材料名称型号规格计量单位价格(元)全介质自承式光缆(ADSS)24芯,G.652,≥24.0kNkm11060全介质自承式光缆(ADSS)24芯,G.652,≥30. 6kNkm12590全介质自承式光缆(ADSS)24芯,G.652,≥39.0kNkm14320全介质自承式光缆(ADSS)24芯,G.652,≥48.0kNkm16600全介质自承式光缆(ADSS)24芯,G.652,≥55.0kNkm18230全介质自承式光缆(ADSS)24芯,G.652,≥62.0kNkm19860全介质自承式光缆(ADSS)16芯,G.652,≥11. 0kNkm6520全介质自承式光缆(ADSS)16芯,G.652,≥16. 0kNkm7430全介质自承式光缆(ADSS)16芯,G.652,≥24.0kNkm103207.18OPGW光缆OPCW光缆72芯,G.652km16610OPCW光缆48芯,G.652km11470OPCW光缆24芯,G.652km93007.19预制光缆预制光缆24芯m89预制光缆12芯m6746续表设备材料名称型号规格计量单位价格(元)7. 20光缆悬垂串光缆悬垂串70kN,ADSS用单线夹套185光缆悬垂串70kN,ADSS用双线夹套298光缆悬垂串70kN,OPCW用单线夹套142光缆悬垂串40kN,ADSS用单线夹套112光缆悬垂串40kN,ADSS用双线夹套2437. 21光缆耐张串光缆耐张串120kN,OPCW用单线夹套234光缆耐张串70kN,ADSS用单线夹套11770kN,ADSS用双线夹套241光缆耐张串光缆耐张串70kN,OPCW用单线夹套102光缆耐张串40kN, AADSS用单线夹套11240kN,ADSS用双线夹套243光缆耐张串7.22光缆接头盒光缆接头盒ADSS光缆用,96芯只426ADSS光缆用,72芯只409光缆接头盒4731
续表设备材料名称型号规格计量单位价格(元)光缆接头盒ADSS光缆用,48芯只373光缆接头盒ADSS光缆用,36芯只337光缆接头盒ADSS光缆用,24芯只306光缆接头盒ADSS光缆用,16芯只277光缆接头盒OPCW光缆用,72芯只500光缆接头盒OPCW光缆用,48芯只457光缆接头盒OPCW光缆用,24芯只404光缆接头盒普通光缆用,96芯只299光缆接头盒普通光缆用,72芯只229光缆接头盒普通光缆用,48芯只207光缆接头盒普通光缆用,24芯只1877.23光缆金具光缆金具ADSS,卡具副31光缆金具ADSS,悬垂金具副66光缆金具ADSS,耐张金具副46光缆金具ADSS,联结金具副10148续表设备材料名称型号规格计量单位价格(元)光缆金具ADSS,防振金具副61光缆金具OPGW,卡具副27光缆金具OPCW,防振金具副59 4932
第8章电线材料名称型号规格计量单位价格(元)8.1封闭母线桥封闭母线桥AC20kV,1250Am17070封闭母线桥AC10kV, 4000Am9210封闭母线桥AC10kV, 3150Am7160封闭母线桥AC10kV,2500Am4770封闭母线桥AC10kV,1250Am2950封闭母线桥AC380V,3150Am6050封闭母线桥AC380V,2000Am4540封闭母线桥AC380V,1250Am24608.2封闭绝缘母线封闭绝缘母线AC1kV,2000Am4740封闭绝缘母线AC1kV,1000Am2190封闭绝缘母线AC380V,3200Am5310封闭绝缘母线AC380V,2500Am46508.3槽形母线槽形母线2500Am10402000Am1020槽形母线5133
续表材料名称计量单位价格(元)型号规格槽形母线1600Am900槽形母线m8901250A槽形母线800Am8808. 4管状母线管状母线6300Am610管状母线6000Am350管状母线5000Am230管状母线4500Am230管状母线4000Am230管状母线3150Am220管状母线2500Am210管状母线2000Am130管状母线1600Am1308.5矩形母线矩形母线4000Am2280矩形母线3150Am137052续表材料名称型号规格计量单位价格(元)矩形母线2500Am1210矩形母线2000Am940矩形母线1250Am4708.6密集绝缘母线槽始端箱密集绝缘母线槽始端箱2500A个4510密集绝缘母线槽始端箱2000A个3910密集绝缘母线槽始端箱1600A个3320密集绝缘母线槽始端箱1250A个2250密集绝缘母线槽始端箱800A个14708.7密集绝缘母线槽连接器密集绝缘母线槽连接器2500A,五相套690密集绝缘母线槽连接器2000A,五相套540密集绝缘母线槽连接器1600A,五相套490密集绝缘母线槽连接器1250A,五相套300密集绝缘母线槽连接器800A,五相套2505334