协91J604:铝合金门窗.pdf

协91J604:铝合金门窗.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:55.1 M
标准类别:建筑工业标准
资源ID:243873
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

协91J604:铝合金门窗.pdf

ZJM 009-3632-2019 燃气用埋地聚乙烯(PE)管材洞口宽1200150018002100高窗外包18146411817541818.2064182+79117971TC 1227TC1527TC1827TC2127洞口宽2400270030003300高窗外包弃116435116442556825 1464 35 568251464351464325868255146425868257971TC2427TC2727TC3027TC3327窗立面四(八)图集号博91J604页号47

C类地区国产铝合金窗平板玻璃最大允計面积表(m²)表3高皮10m处24m处50m处基本235681012235681012356810120.30(KH/m²)0.961.573.603.804,004.004.001.082.653.594.004.004.00o.511.221. 7 /2.3/3.374.000.350.821.253.243.7 /4.004.004.000.560.942.303.245.864.004.000.431.051.481.992.903.890.400.721.152.893.6380004.000.380.921.301.752.553.470.450.641.042.524.003.364.000.320.79I.121.502.203.010.500.570.952.323.263.874.004.000.290.7/1.001.361.982.720.550,520.301.962.7564.000.91.231,842.470.600.480.781.892,663624.000,240.590.831,12.642.260.650.440,721.772,48373.374.00o.220.541.Q42.080.700.400.681.642. 313.11.583,/24,000,200.500.70.961. 9.20.750.380.631,522,13.493920.461.80C类地区指密集建筑群的大城市市区续表3高度M100m处150m注:1本表使用方法:根据工程所在地理位置,查《建筑基本结构荷戴规范》中的“全国基本风压分布图”得出鼓域区的3568101251012基本凤压值W.然后根摄距块表南度,从表1.表2,查得玻0.30(KN/m2)0.400.981.371.832670.852.363.24瑞厚度及玻璃光许最大醇积,0.350.340.821.162.762.上表为玻璃四周围定时的允計最大面积在实际应用中.尚应0.400.290.721.01360.891.762.422.15根据玻璃厚度.窗扇开放形式窗扇刚度余以相应的折撤系数:0.450.260.90211.77230.560.791.560.241.93固定窗可取接近表列数值推拉翻来0.9:开启留来0.6~g8,0.500.570.80.400.550.200.510.720.961.411.940.190.450.640.881.281.762厚玻瑞取下限;外率开窗取下限转动窗取中限或上限,0.600.190.46.650.88.780.160.400.590.801.I 71.61玻璃的長宽比一搬不宜大于1:2.0·650,170.430.600.820,160.380.550.731,081.483,圆定门及开启门玻璃的允计最大面积,参照2条送用。0.700.16.520.360.510.681.001,384.本表条自建設部建筑設計院《统一技术措施》0.750.15.36.52330.6o40.931.2 8建筑部份.(一九九0年10月)附汞:玻璃最大允計面积表c类图集号91J 60478

根据建设部(90)建设学第204号颁布《关 于工程建设标准设计编制与管理的若于规定》 本图集版权所有,任何单位和个人不得翻印和 复制,违者按版权法的规定追究法律责任

©版权声明
相关文章