parker接头样本

parker接头样本
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:3.2M
标准类别:电力标准
资源ID:228705
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

parker接头样本

FluidConnectors

FluidConnectors

DG/TJ08 2034-2008 预拌混凝土和预制混凝土构件生产质量管理规程nedium)forhigherservicetemperatures

ableH1—Pressure Reductions ntermediate values are to be interpolated

AssemblyInformation

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Catalog4300 Technical Datal

Assembly in fitting body (for steel and copper tubes

Catalog4300 Technical Data

Assembly in fitting body

Catalog4300 Technical Data

Parker Hannifin Corporation Tube Fittings Division Columbu

Catalog4300 Technical Data

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Catalog4300 Technical Data

Assemblingwithsupportsleeves(VH)

Fig.H5EOFitting CompletelyAssembled withSupport S

EO Fitting Completely Assembled with Support Sleeve

Catalog4300 Technical Data

Assemblyofsupportsleeves

Catalog4300 Technical Data

Connectors,UnionsandElbows

ubeunlohs G, W, T, K, SV, WSV, ESV, RED, KOR, GR, TR

Assemble tube ends and swivel ends in accordance with the Tube End Assembly Information on pages H8 through H13.

Connectorsand Elbows (DIN3852):

Connectorsand Elbows

BanjosandSwivels

Banjo Assembly:SWVE,WH,TH

ivel Assembly: EW, ET, E

Assembly of the male stud end should be in accordance with the informationabove insectionConnectorsand Elbows(DlN [3.852)

Weld Nipples

Weld Nipple Assembly

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Catalog4300 Technical Datal

Surface Finish: EO Hydraulic Flange fittil Socket head cap screws Spring washer

ableH4 Number of Revoluations and Starting Torques **A minimum working pressure of 10 bar is necessary!

Flange Assembly: Assemble tube ends in accordance with the Tube End Assembly Information on pages H8 through H13. See Table H3 for torque information for socket head cap screwsforBFGand BFWflange fittings.

Socketscrew Tightening centers Sockethead torques (LK) cap screws Nm* LK35 M6 10 LK40 M6 10 LK55 M8 25

TableH3Tightening Torques forFlangeAssemblies *Based on friction number utotal = 0.14

BallBearingRotaryFittings

FluidConnectors

PlainBearingRotaryFittings

TableH5NumberofRevolutions

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Catalog4300 Technical Data

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Catalog4300 Technical Data

EOTroubleShootingGuide

TableH7EOFittingTroubleShootingHints

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Catalog4300 Technical Datal

Introduction

Design and Construction

FluidConnectors

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Catalog4300 Technical Datal

Part Numbering

TheAdvantages

The Applications

Media Compatibilit

Permissible working media for NBR seal materials (e.g. buna V

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Tube Fittings Division Columbus. Qhic

Catalog4300 Technical Data

Parker Hannifin Corporation Tube Fittings Division Columbi .Ohio

Catalog4300 Technical Data

HydraulicPresettingMethods

Parker Hannifin Corporation Tube Fittings Division Columbi Ohio

Catalog4300 Technical Data

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Tube Fittings Division ParkerHannifinCorporation

Catalog4300 Technical Data

Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic

Tube Fittings Division ParkerHannifinCorporation

Catalog4300 Part Datal

Metric Tube End Al3 Ends

All dimensions in millimeters

Parker Hannifin Corporation Tube Fittings Division Columbu

Catalog4300 Part Datal

Union Cross

Metric Tube End Am 4 Ends

I dimensions in millimeters

Dimensions given approx.figures with tightened nut

Parker Hannifin Corporation Tube Fittings Division Columbu

Catalog4300 Part Datal

Male Connector

AQ 4238-2014 日用化学产品生产企业防尘防毒技术要求MetricTubeEnd /Male BSPT/BSPP Thread

All dimensions in milimeter

Continuationof LandseriesSseepageH30

Parker Hannifin Corporation Tube Fittings Division Columbu

Catalog4300 Part Datal

Male Connector

DL/T 2006-2019 干式空心电抗器匝间绝过电压试验设备技术规范MetricTubeEnd /Male BSPT/BSPP Thread

All dimensions in milimeter

©版权声明
相关文章