GB/T 8075-2017 标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
GB/T 8075-2017 混凝土外加剂术语GB/T 80752017
GB/T 8075—2017
GB/T 80752017
重复性限repeatabilitylimit
GB 51220-2017 生活垃圾卫生填埋场封场技术规范GB/T 80752017
GB/T 8075—2017
落度保留值 ....5.21
GB/T 80752017
再现性条件 再现性限 6.9 早强剂 4.8 早强型高效减水剂 4.2.3
GB/T 8075—2017
4.3.3 早强型普通减水剂 4.1.3 增稠剂 4.16.1 折固掺量 6.2.5 终凝时间 5.13.2
主要功能 着色剂 4.14 阻锈剂 4.20 1h沉隆距 5.35
GB/T 80752017
defoamer 4.12 defoaming agent 4.12 delayed addition method for admixture 7.7 difference in setting time ....... 5.13.3 dosage of admixture 6.2 dosage of liquid admixture in solid content 6.2.5
4.18 4.18 5.40
gas forming admixture 4.22
rdening accelerating admixtur ardening accelerating type high performance water reducing admixture ardening accelerating type high range water reducing admixture rdening accelerating type water reducing admixture gh performancewater reducing admixture gh rangewater reducing admixture
inclusive dosage method index of relative durability 5.28 initial setting time 5.13.1 initial slump ....... 5.20
QJFQ 0001S-2015 莒南县福群食品有限公司 脱皮花生仁dosage method relative durability 5.28 ting time 5.13.1 5.20
limit of ammonia emitted from the concrete admi
GB/T 80752017
Timit value of the harmful suhst
GB/T 80752017
CNAS GI01-2015 检验机构认可指南tested concrete tested concrete cured in standard condition 6.16 tested concrete curing at minus temperature 6.17 tested mortar 6.12 thickening admixture 4.16.1 timeofflowcone 5.32 total of binder 6. total of cementitious material type inspection
GB/T 80752017
uniformity