标准规范下载简介和部分内容预览:
混凝土结构病害监测与识别%00 %cB Vol. 36 No.
1112 0 1 0 E1
谈总监对施工方案的审查intensificationtechnologyofframe
WEI Qaozher
According to the introduction of structural form of the steel concrete frame beam of the engineering , the paper researche he intensification scheme and the selection of temporary support in construction , and it is proved that the engineering C ter the intensification treatment , and to meet the stability and loading demand of the structure.
:2009209221 .%11%(19722),/f,”%d/+“α..%,1712000
©版权声明
资源来自互联网,如有侵权请联系删除