标准规范下载简介和部分内容预览:
压力容器用钢板压力容器用钢板是制造承压设备(如锅炉、储罐、反应器等)的关键材料,主要用于承受高温、高压或腐蚀性介质的工况。这类钢板具有优良的力学性能、焊接性能和抗腐蚀能力,能够满足不同工况下的使用需求。
压力容器用钢板通常按照国家标准(如GB/T713《锅炉和压力容器用钢板》)、国际标准(如ASME规范)或其他行业标准生产。根据化学成分和性能特点,可分为碳素钢、低合金钢和不锈钢三大类。碳素钢(如Q245R、Q345R)适用于中低压容器;低合金钢(如16MnDR、07MnMoVR)通过添加合金元素提高强度和低温韧性,适合苛刻环境;不锈钢(如304L、316L)则用于强腐蚀性介质场合。
为确保安全性,压力容器用钢板需经过严格的检验与认证,包括超声波探伤、力学性能测试和化学成分分析等。此外多层公寓一期工程地下室混凝土专项施工方案,钢板的厚度方向性能(Z向性能)对防止层状撕裂尤为重要,常通过特殊工艺控制夹杂物分布来实现。
随着工业技术的发展,压力容器用钢板正朝着高强度、高韧性和耐极端环境的方向发展,以适应更复杂的应用需求。例如,核电领域使用的SA508Gr.3钢板具备优异的抗辐照性能,而深冷行业则需要具有良好低温韧性的9Ni钢。这些高性能材料的研发和应用,推动了压力容器制造业的技术进步。
ICS 77.140.30 H 46
"mm600~>750>1000>1200>1500>1700>18002000>2300>2500>2600>2800>3000>3200>3400>3600 d750~1000~1200~1500~1700~1800~2000~2300~2500~2600~2800~3000~3200~3400~3600~3800+“《十6~7.50.450.550.600.600.750.750.750.80>7.5~100.750.750.850.850.900.900.901.001.151.151.15>10~130.750.750.850.850.950.950.951.051.251.251.251.55>13~250.750.750.850.951.151.351.351.551.651.75>25~300.850.850.951.051.251.451.551.651.751.85>30~340.951.051.051.151.351.551.651.751.952.050.25>34~401.151.251.351.451.551.751.851.952.152.25>40~501.351.451.551.651.751.952.052.152.352.45>50~601.651.751.851.952.052.152.152.252.352.55>60~802.552.552.552.552.652.752.852.852.852.852.952.95>80~1002.952.952.952.953.053.053.053.153.153.153.153.15>100~1203.253.253.253.353.453.453.553.553.553.553.553.552"mm“+”600~>750>1000>12001500>1700>1800>2000>2300|>2500|>2600|>2800>3000|>3200|>3400|>3600"eT"750~1000~1200~1500~1700~1800~2000~2300~2500~2600|~2800|~3000~3200|~3400~3600~3800”T”,%6~7.50.100.150.180.180.250.250.250.28>7.5~100.250.250.300.300.320.320.320.380.450.450.45>10~130.250.250.300.300.350.350.340.400.500.500.500.65>13~250.250.250.300.350.450.550.550.650.700.75>25~300.300.300.350.400.500.600.650.700.750.80>30~340.350.400.400.450.550.650.700.750.850.90>34~400.450.500.550.600.650.750.800.850.951.00>40~500.550.600.650.700.750.850.900.951.051.10>50~600.700.750.800.850.900.950.951.001.051.15>60~801.151.151.151.151.201.251.301.301.301.301.351.35>80~1001.351.351.351.351.401.401.401.451.451.451.451.45>100~1201.501.501.501.601.601.651.651.651.651.651.651.65