DB11 938-2012 绿色建筑设计标准 英文版.pdf

DB11 938-2012 绿色建筑设计标准 英文版.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:27.7 M
标准类别:建筑工业标准
资源ID:255911
VIP资源

标准规范下载简介和部分内容预览:

DB11 938-2012 绿色建筑设计标准 英文版.pdf

continue4.2.2

continue 4. 2. 2

continue 4. 2. 2

continue 4. 2. 2

SC/T 6080-2015 渔船燃油添加剂试验评定方法continue4.2.2

3GreenDesignIndex System at BuildingD

Table 4.3.2Green Building Design Index Table

continue4.3.2

continue 4.3.2

continue 4.3. 2

continue 4.3.2

SchemeandDesignDocuments ofGreenBuilding

5.1Scheme of Green Building

Technical feasibility analysis; Economic feasibilityanalysis; Benefit analysis; Risk analysis.

5.2OrganizationofGreenBuildingDesign

5.2.1Theprojectbuilder shall organizeagreenbuildingteam.Theteammembersshall include theunitsrelatedtotheproject construction,usageand operatingmanagement,such as theunits of builder,design,consultation,construction,supervision,propertymanagement,etc. 5.2.2Theconsultationunit ofgreenbuildingshoulddevelopworkattheschemedesignstageor earlier,and shall fully respect the integral requirements of the project and provide the scheme of greenbuilding,advicefordesign,andtechnicalsupport, 5.2.3Thedesignunitof greenbuildingshall reasonablydeployprofessional technicians,and shouldappoint a directorforgreenbuildingdesign,everyspecialtyshall cooperativelywork ateach stageaccordingtotheprincipleoftechnicalsharing,balanceandintegration. 5.2.4In thedesign documents all therelevantspecialties shallgivecleardesignrequirementsfor green building to the special design, and shall check and confirm whether the special design meets thecorrespondingrequirementsornot,

5.3DesignDocumentsof GreenBuildingDesign

Planning and Design

6.1General Requirements

6. 2Land Use Planning

6.2.1Thesiteselectionshallbeinaccordancewiththefollowingrequiremer

6.3TransportationPlanning

6.3Transportation Planning

landscapedesign,supporting restfacilities shall be provided,andgreening and shading techniques

6.4ResourceUtilization

6.5Ecological Environment

Architectural Design

7.1 General Requirements

7.2Building Space Layout

7.3Building Envelope

7.4Building Material

7.4.5Constructionproject anddecorationproject shouldbedesigned andconstructed in integra

7.5BuildingAcousticalEnvironment

7.6Daylighting

7.6.1Theplanning and architectural design shall meet the requirement of sunshine in nationa

7.6.1Theplanning and architectural design shall meet the requirement of sunshine in nationa

7.7Natural Ventilation Environment

1Techniquesfor inducingdraft shouldbeemployed,suchasair guidingwall,ain indow,air drafting shaft,ventilating duct,natural ventilator,solarairdrafting duct,u

oftheundergroundspace

7.8 Indoor Air Quality

7.9OtherRequirements

Structure Design

8.1General Requirements

8.2Design of Main Structure

8.2Design of Main Structure

8.3Design of BuildingFoundation

8.4DesignofRenovationandExtensionS

Design of Water Supply and Sewerage

QKSY 0002S-2015 昆明硕洋食品生产有限公司 杂粮(其他粮食加工品)9.1GeneralRequirements

9.2Water Supply System

9.2.3Whenmunicipalwatersupplysystemandmunicipalrecycledwatersystemareadopted,t

WaterSavingEquipment andSanitaryWa

9.4.1Reclaimedwaterfacilitiesmustbedesignedandconstructedforthefollowingnewlybuilt

Obviousidentifiersofnontraditionalwatersourceshallbearrangedinthepositionsof cisterns (watertanks),valves,watermeters,turncocks andwateroutlets; 3Lockingdevices shallbe arranged on theturncocksof nontraditional watersource inpublic placesand thewateroutlets forgreening.

GB/T 28492-2012 钮扣通用技术要求和检测方法 铜质类10.1GeneralRequirements

0.2Energy Transportation and Distributio

Energy Transportation and Distribution

©版权声明
相关文章