河北发电厂#2机组脱硫工程施工组织设计

河北发电厂#2机组脱硫工程施工组织设计
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
文件类型:.rar
资源大小:999.50K
资源类别:施工组织设计
资源属性:
会员资源

施组设计下载简介:

内容预览随机截取了部分,仅供参考,下载文档齐全完整

河北发电厂#2机组脱硫工程施工组织设计

内蒙古**有限公司一期2×600MW机组工程

1作业项目概况··························································1

2编制依据······························································1

3作业准备······························································1

4作业程序及方法························································4

5作业的质量措施························································10

6作业的安全环境技术措施················································13

7职业健康安全与环境危险识别及控制措施··································17

专业施工组织技术方案报审表

市政工程--陕西某室外管道施工组织设计致:北京****一期工程项目监理部

我方已根据施工合同的有关规定,完成了GGH安装专业组织设计的编制,并经我单位上级技术负责人审查批准,请予以审查。

专业监理工程师审查意见:

总监理工程师审核意见:

本表一式三份,由承包单位填报,项目法人、监理单位、承包单位各存一份

©版权声明
相关文章