NFPA70-2008标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
NFPA70-2008美国国家电气规范(英文版).pdfNATIONAL ELECTRICAL CODE
Pe s e giesl npa nitted without license from IH
GB/T 21972.2-2012 起重及冶金用变频调速三相异步电动机技术条件 第2部分YZP系列起重及冶金用变频调速三相异步电动机(轴流风机冷却)NATIONAL ELECTRICAL CODE 2008 Edition
NATIONAL ELECTRICAL CODE
Chapter 8CommunicationsSystems
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
NATIONAL ELECTRICAL CODE COMMITTEE
These lists represent the membership at the time the Committee was balloted on the final text of this edition. Since that time, changes in the membership may have occurred. A key fo classifications is found at the back of this document
Technical Correlating Committee
Committee Scope: This Committee shall have primary responsibility for documents on minimizing the risk of electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations.
ohn D.Minick,Chai
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
Gil Moniz, National Electrical Manufacturers Association, MA [M] (Alt. to J. D. Minick) AIfredo M Ramirez, Underwriters Laboratories Inc., IL [RT] (Alt. to K. P. Boyce) John W. Troglia, Edison Electric Institute, WI [UT] (Alt. to N. F. LaBrake, Jr.) Nonvoting Ark Tsisserev, City of Vancouver, Canada Rep. CSA/Canadian Electrical Code Committee
Gil Moniz, National Electrical Manufacturers Association, MA [M] (Alt. to J. D. Minick) AIfredo M Ramirez, Underwriters Laboratories Inc., IL [RT] (Alt. to K. P. Boyce) John W. Troglia, Edison Electric Institute, WI [UT] (Alt. to N. F. LaBrake, Jr.) Nonvoting Ark Tsisserev, City of Vancouver, Canada Rep. CSA/Canadian Electrical Code Committee
Raymond W. Weber, Chair State of Wisconsin, WI [E] Rep. Intermational Association of Electrical Inspector
NATIONALELECTRICAL CODE 2008 Edition
Melvin K. Sanders, Things Electrical Co., Inc. (TECo., Inc.), IA [U] Rep. Institute of Electrical & Electronics Engineers, Inc. John E. Sleights, St. Paul Travelers, CT [1] Alternates Shane M. Clary, Bay Alarm Company, CA [M] (Alt. to S. E. Egesdal) Adam D. Corbin, Corbin Electrical Services, Inc., NJ [IM] (Alt. to L. S. Ayer) Danny Liggett, Dupont Company, TX [U] (Alt. to D. A. Pace) T. David Mills, Bechtel Savannah River, Inc., SC [U] (Alt. to M. K. Sanders) Mark C. Ode, Underwriters Laboratories Inc., NC [RT] (Alt, to T. J. Guida)
NATIONAL ELECTRICAL CODE COMMITTEE
Roger S. Passmore, Davis Electrical Constructors, Inc., Sc [IM] (Alt. to S. J. Owen) Marty L. Riesberg, IBEW Local Union 22, MD [L] (Alt. to P. J. Casparro) George A. Straniero, Tyco/AFC Cable Systems, Inc., NJ [M] (Alt. to L. Easter) Robert J. Walsh, City of Hayward, CA [E] (Alt. to R. P. Owen) Nonvoting Edward C. Lawry, Oregon, WI [E] (Member Emeritus)
James M.Naughton,Chair IBEW Local Union 103, MA [L] Rep. International Brotherhood of Electrical Worke
Ronald J. Toomer, Chair Toomer Electrical Company Inc., LA [IM] Rep. National Electrical Contractors Association
Ronald J. Toomer, Chair
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
Joseph P. DeGregoria, Underwriters Laboratories Inc., NY [RT] (Alt. to C. Mello) Ronald Lai, FCI Electrical, NH [M] (Alt. to G. J. Steinman) Paul J. LeVasseur, Bay City JEATC, MI [L] (Alt. to D. Hammel) Richard E. Loyd, R & N Associates, AZ [M] (Alt. to M. J. Brett, Jr.) Michael E. McNeil, FMC Corporation/Bio Polymer, ME [U] (Alt. to P. Dobrowsky) Nathan Philips, Integrated Electronic Systems, OR [IM] (Alt. to R. J. Toomer)
Paul R. Picard, Tyco/AFC Cable Systems, Inc., MA [M] (Alt. to R. Temblador) Elliot Rappaport, Electro Technology Consultants, Inc., FL [U] (Alt. to D. C. Mohla) Phil Simmons, Simmons Electrical Services, WA [M] (Alt. to D. Brender) David A. Williams, Delta Charter Township, MI [E] (Alt. to M. J. Johnston) Nonvoting Robert A. Nelson, Canadian Standards Association, Canada [RT]
Paul R. Picard, Tyco/AFC Cable Systems, Inc., MA [M] (Alt. to R. Temblador) Elliot Rappaport, Electro Technology Consultants, Inc., FL [U] (Alt. to D. C. Mohla) Phil Simmons, Simmons Electrical Services, WA [M] (Alt. to D. Brender) David A. Williams, Delta Charter Township, MI [E] (Alt. to M. J. Johnston) Nonvoting Robert A. Nelson, Canadian Standards Association, Canada [RT]
Scott Cline, McMurtrey Electric, Inc., CA [IM] Chal Rep. National Electrical Contractors Association
Articles 320,322,324,326,328,330,332,334,336,338, 340,382,394,396,398
NATIONAL ELECTRICAL CODE 2008 Ed
NATIONAL ELECTRICAL CODE COMMITTEE
Alternates William B. Crist, Houston Stafford Electric Company, TX [IM] (Alt. to C. J. Fahrenthold) James D. Erwin, Celanese, Ltd., TX [U] (Alt. to G. L. Runyon) Rogers Hester, Jr., Encore Wire Limited, TX [M] (Alt. to G. A. Straniero) James K. Hinrichs, State of Washington, WA [E] (Alt. to G. D Rogers) Jacob Killinger, Underwriters Laboratories Inc., IL [RT] (Alt. to J. J. Cangemi)
Samuel R. LaDart, City of Memphis, TN [L] (Alt. to H. C. Brown) David Mercier, Southwire Company, GA [M] (Alt. to J. M. Daly) Dennis A. Nielsen, Lawrence Berkeley National Laboratory. CA [U] (Alt. to H. R. Stewart) Peter Pollak, The Aluminum Association, Inc., VA [M] (Alt. to T. Edwards) Thomas H. Wood, Cecil B. Wood Inc., IL [IM] (Alt. to M. D. Adams)
Articles 342,344,348,350,352,353,354,356,358,360,362,366,368,370,372, 374,376,378,380,384, 386, 388, 390, 392, Chapter 9, Tables 1 through 4, Annex C
Julian R. Burns, Chair Burns Electrical/Quality Power Solutions, Inc., NC [IM] Rep. Independent Electrical Contractors, Inc.
Julian R, Burns, Chair Burns Electrical/Quality Power Solutions, Inc., NC [IM] Rep. Independent Electrical Contractors, Inc.
NATIONAL ELECTRICAL CODE
Robert A. McCullough, Chai
NATIONAL ELECTRICAL CODE COMMITTEE
Paul W. Myers, Innovene LLC, OH [U] (Alt. to S. Sengupta) Donald R. Offerdahl, North Dakota State Electrical Board, ND [E] (Alt. to R. A. McCullough) Rhett A. Roe, IBEW Local Union 26 JATC, MD [L] (Alt. to R. D. Belisle)
James T. Dollard, Jr., Chail IBEW Local Union 98, PA [L] Rep. International Brotherhood of Electrical Worker
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
Thomas E. Moore, City of North Royalton, OH [E] (Alt. to R. G. Fahey) Arthur S. Neubauer, Colonial Pipeline Company, GA [U (Alt. to P. S. Hamer) George J. Ockuly, O'Fallon, MO [M] (Alt. to V. J. Saporita) Charles L. Powell, Eastman Chemical Company, TN [U] (Alt, to W. D. Glover) Arthur J. Smith, II, Waldemar S. Nelson & Company,. Inc., LA [U] (Alt. to L. F. Saunders) Russell A. Tiffany, Johnson Controls, Inc., PA [M] (Alt. to R. L. Bunch)
Timothy N Croushore, Chai Allegheny Power, PA [UT] Rep. Electric Light & Power Group/EE
NATIONAL ELECTE
NATIONAL ELECTRICAL CODE COMMITTEE
Thomas H. Wood, Chair Cecil B. Wood Inc., IL [IM] Rep. National Electrical Contractors Association
David Mascarenhas, Canadian Standards Association Canada [RT]
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
Ted H. Schnaare, Rosemount Incorporated, MN [M] (Alt. to L. E. Massey) John L. Simmons, Florida East Coast JATC, FL [L] (Alt. to M. J. Bernsen) Donald W. Zipse, Zipse Electrical Engineering Inc., PA [U] (Alt. to J. D. Cospolich) Nonvoting Timothy J. Pope, Canadian Standards Association, Canada [RT] Eduardo N. Solano, Estudio Ingeniero Solano S.A. Argentina [SE] Fred K. Walker, U.S. Department of the Air Force, FL [U] Rep. TC on Airport Facilities
Underwriters Laboratories Inc., NY [RT] DonaldJ.Talka,
NATIONAL ELECTRICAL CODE COMMITTEE
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
Robert E. Wisenburg, Coates Heater Company, Inc., [M] (VL to 680) (Alt. to Lee L. West) Nonvoting Andrew M. Trotta, U.S. Consumer Product Safety Commission, MD [C] Douglas A. Lee, U.S. Consumer Product Safety Commission, MD [C]
Articles 545, 547, 550, 551, 552, 553, 555, 604, 675, Annex D, Examples D11 and D12
8 Editior ATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL CODE COMMITTEE
David W. Johnson, CenTex IEC, TX [IM] (Alt. to W. B. Bowman) Kent Perkins, Recreation Vehicle Industry Association, VA [M] (VL to 550, 551, 552) (Alt. to B. A. Hopkins) Michael J. Slifka, PFS Corporation, WI [M] (VL to 550, 551, 552) (Alt. to J. Mikel) Raymond F. Tucker, Consulting Professional Engineer/RADCO, CA [RT] (VL to 545, 550, 551, 552) (Alt. to M. L, Zieman) Eugene W. Wirth, Underwriters Laboratories Inc., WA [RT (Alt. to T. R. Lichtenstein)
NEPA Electrical Engineering Division Technical Staff
Chai National Infrastructure Institute. NH [L
NB/T 10440-2020 风力发电机定子绕组绝缘结构评定规程 耐湿热性Committee Scope: This Committee shall have primary responsibility for documents on minimizing the risk of electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations
ommitteeScope:ihisCommitteesnall Ior documents on minimizing the risk o electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations.
Copyright National Fire P Protection Association
GB/T 39848-2021 平板显示器色域测量方法Pe s e giesl npa nitted without license from IH
NATIONAL ELECTRICAL CODE
ARTICLE 90INTRODUCTION